Dataset applied in "Backcasting Technical and Policy Targets For Constructing Low-Carbon Power Systems"

0
0 ratings - Please login to submit your rating.

Abstract 

This dataset provides the data applied in the case studies of the manuscript "Backcasting the Techno-economic Targets For Constructing Low-carbon Power Systems". Both the modified Garver’s 6-bus and realistic Northwest China power system are presented here, in two excel files respectively. The datasets include detailed information about buses, units, existing corridors, and candidate corridors. Average cost variations and load growth rate over the planning period are also provided.

Instructions: 

The meaning of each table and header is explained in the sheet named "Instruction".