Test systems are important tools and benchmark for power system research. Currently, there is a lack of standard test systems for modern transmission expansion planning (TEP) research, especially under high variable renewable energy (VRE) penetrations. This paper describes a 38-bus test system named the HRP-38 system dedicated to TEP. “HRP” stands for high renewable penetration. The objective of establishing such a system is to provide a consistent platform for different TEP methods to be tested and compared. The test system considers high VRE penetration of more than 30% energy share, which will be an important feature in many power systems in the future. Both AC and DC candidate lines are given to provide sufficient transmission planning alternatives. The complexity of the test system is well balanced considering calculation tractability and the ability to test the performance of the TEP planning model. The network topology, generation mix, and load characteristics are described in detail. Year-round time series of VRE (wind power and PV) output and load curves for each bus are provided to facilitate a detailed evaluation of the transmission grid configuration under high VRE penetration. Finally, three benchmark results with different optimization targets are provided for the HRP-38 system.

Instructions: 

This repository includes the dataset of HRP-38 system in both .xlsx and .mat file. The index of the selected typical day used in Case Study is also included.

Comments

Thank you.

Submitted by Soumyadeep Nag on Fri, 04/03/2020 - 17:48

Thank you

Submitted by QU Boyang on Tue, 10/19/2021 - 02:39

Thank you!

Submitted by Zhang Xi on Tue, 09/22/2020 - 10:49

Thank you!

Submitted by Muqing Yang on Thu, 11/26/2020 - 07:46

Thank you!

Submitted by Ziyang Zhang on Fri, 01/22/2021 - 02:31

谢谢

Submitted by lee ji on Sun, 03/21/2021 - 09:16

Thank you!

Submitted by key zhong on Mon, 04/05/2021 - 07:49

Is the fixed cost and investment cost data in unit sheet wrong? I think the unit of fixed cost should be CNY/KW/year and the investment cost should be in 10^7 CNY

Submitted by Zhang Yuxin on Mon, 10/18/2021 - 07:07

Thank you

Submitted by QU Boyang on Tue, 10/19/2021 - 02:40

谢谢

Submitted by long luo on Mon, 11/15/2021 - 06:11