Inputs for capacity planning case of Turkey

Citation Author(s):
Thomas
Nikolakakis
Submitted by:
Thomas Nikolakakis
Last updated:
Tue, 10/11/2022 - 10:32
DOI:
10.21227/afjj-1758
License:
136 Views
Categories:
0
0 ratings - Please login to submit your rating.

Abstract 

The data set includes inputs required by EPM to run optimization. Such inputs include generator techno-economic specs, demand and other system parameters

Instructions: 

GeneratorData: Technoeconomic info of generators

MinGen:MinimumGeneration Level

MaxGen:Maximum Generation Level

MinimimCF: Minimum capacity factor

MaxCF daily: Maximum capacity factor on a daily basis

External H2 demand: Mandatory demand for H2 in mmBTU

Storage: Techno economic data of storage technologies

SNSPLimit: System non synchronous penetration limit

Gen Avaiability Annual: Maximum availability of generators per month and year

H2 data: technoeconomic info of electrolyzers

H2 availability: Availability of electrolyzers

Duratoin: Hours per time step

Demand: Hourly load in MW

FuelPrices; Fuel Price projections

REProfileAnnual: Hourly capacity factor of VRE generators

SpinnngReserve: System need for operating reserve

Reserve: System need for capacity reserve

Emissions: Emissions cap in tons of CO2

EmissionsFactors: Emissions factors

Comments

 

 

Submitted by Wilian Guaman on Sun, 11/17/2024 - 21:04